Massivhaus | Dofollow Social Bookmarking Sites 2016
Facing issue in account approval? email us at info@ipt.pw
1
The gravel subgrade has been created, drainage pipes are laid in the gravel base and a stainless steel foundation earth electrode is built into the gravel. According to the laying plan, all numbered edge elements with attached base plates and frost apron are laid, aligned, and glued. A film was laid out as a moisture barrier, on top of which the KU spacers to accommodate the lower reinforcement. A grounding strap was attached to the steel mat in accordance with the DIN standard.

Comments

Who Upvoted this Story